Daily Treatment Solutions: Designing for the m3/Day That Matters
A daily treatment solution plans every tank and process step around the actual daily throughput in m3/day, using modular GFS units so installed capacity tracks real demand instead of a padded estimate. Daily flow - not annual averages - is what the reactors must survive hour to hour.

1. Plan Around the Day, Not the Year
Plants are often specified on annual or monthly figures that hide the daily reality. The design that matters is the daily throughput plus its peak. Building to a smoothed number undersizes the equalization that buffers the real day. A daily treatment solution starts from the 24-hour volume and its swing.
2. Modular Units Track Demand
Bolted GFS tanks - 200-60,000 m3, glass fused at 820-930 C, ISO 28765 and AWWA D103 - let the plant add exactly the daily capacity needed, stage by stage. For a 300 m3/day livestock stream, that means a compact, right-sized train rather than a sprawling one sized for a day that never comes.
3. Match Capacity to Demand
Overcapacity wastes tankage and the energy to mix or heat it; undercapacity forces bypass. The daily treatment solution lands between by sizing to measured daily throughput and peak, then confirming with the pollutant profile.
Comparison: Capacity Bases
| Basis | Risk if used alone | Better use |
| Annual average | Hides daily swing | Context only |
| Daily throughput | Solid design core | Primary basis |
| Peak hour | Drives equalization | With daily |
Project Case Study
Gaopu Dashun Hoggery Wastewater Treatment Project (Puning, Guangdong, China). A pig-farm manure-cleaning wastewater plant built for 300 m3/day on a pre-process + USR + AOAO train - a daily treatment solution right-sized to a concrete daily throughput rather than a generic estimate.
| Project | Gaopu Dashun Hoggery Wastewater Treatment Project |
| Location | Puning, Guangdong, China |
| Industry | Livestock / Hoggery |
| Application | Pig farm manure-cleaning wastewater |
| Process | Pre-process + USR + AOAO |
| Capacity | 300 m3/day |
| Status | Delivered |
About Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel)
Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) manufactures the bolted GFS tanks that hold daily capacity: enamel fused at 820-930 C forms an inert barrier against corrosive livestock wastewater, engineered to ISO 28765 and AWWA D103, shipped flat-pack and assembled on site. Daily treatment starts with daily-sized tankage.
Design to the daily throughput and its peak, then build capacity in modular GFS units that track demand. Send your daily flow and pollutant profile and we will size the daily treatment solution.
Frequently Asked Questions (FAQ)
Q1: What does daily treatment mean?
A: Sizing every tank and process step to the actual daily throughput in m3/day plus its peak.
Q2: How is daily capacity planned?
A: From measured daily flow and peak, confirmed against the pollutant profile.
Q3: Why modular units?
A: Bolted GFS tanks add exactly the capacity needed, stage by stage, without concrete.
Q4: How do you avoid oversizing?
A: Size to measured daily throughput and peak, not a padded annual estimate.
Q5: What tank sizes are available?
A: GFS tanks from 200 m3 to 60,000 m3.
Q6: What standards apply?
A: Tanks are built to ISO 28765 and AWWA D103.
Suggested CTA
Send your daily flow and profile. We will size a daily treatment solution in modular GFS tankage.