What Equipment Is in a Biomethane Plant?

A biomethane plant is a line of units: a feed buffer, pre-treatment to strip water and H₂S, an upgrading unit that raises methane to 95-99%, a compressor to 200-250 bar, storage banks, and finally either vehicle dispensing or grid injection. Each stage has one job, and the plant is only as good as the interface between them, so they are engineered as one skid rather than bought separately.

The Equipment Line

Biogas from the digester first enters a buffer that smooths flow. Pre-treatment dries the gas and removes sulfur. The upgrader separates methane from CO₂ and traces. The compressor raises pressure, storage holds it, and the last stage sends it to vehicles or the gas grid.

Design Parameter Table

EquipmentTypical value or rangeWhy it matters
UpgradingPSA / membrane / water scrubSets methane purity
Methane purity95-99% CH₄Fuel or grid grade
CompressionTo 200-250 barStorage and dispensing
StorageCascade steel banksBuffers output
Off-takeDispense or injectTwo end uses
Limitation to checkSlip loss 0.1-3%Membrane/PSA losses

Upgrading Technology Compared

TechnologyPurityNote
PSA95-99% CH₄Adsorption, compact
Membrane95-99% CH₄Simple, 0.1-3% slip
Water scrubbing95-98% CH₄Mature, water use

Project Case Study

Zhenyuan Group Biogas Project, Henan. This plant turns 650 tonnes per day of farm manure and washing wastewater into 3 million m³ per year of vehicle-grade methane, an end-to-end chain of digestion, upgrading, and fuel-grade handling that illustrates the full biomethane equipment line.

ProjectZhenyuan Group Biogas Project, Henan
LocationXinzheng, Henan, China
IndustryAgriculture / Renewable Fuel
ApplicationVehicle-grade methane production
ProductCSTR primary 3 × Ø15.29 × 15 m, secondary Ø5.22 × 6 m
Result3,000,000 m³ vehicle-grade CH₄ per year
StatusDelivered 2013

About Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel)

Shijiazhuang Zhengzhong Technology Co., Ltd (Center Enamel) supplies the product technology at both ends of the biomethane line: GFS digester and gas-holder tanks for the biogas source, and pressure-vessel manufacturing capability (I/II class license, ASME, ISO 9001) for the compression and storage end. The company frames the plant as one engineered system from feed to fuel.

A biomethane plant is buffer, pre-treatment, upgrader, compressor, storage, and off-take, engineered together. Send your biogas flow and purity target and we will lay out the equipment line.

Frequently Asked Questions (FAQ)

Q1: What are the parts of a biomethane plant?
A: Feed buffer, pre-treatment, upgrading unit, compressor, storage banks, and dispensing or grid injection.

Q2: Which upgrading technology is used?
A: PSA, membrane, or water scrubbing, each reaching about 95-99% methane with different footprint and slip loss.

Q3: What comes after upgrading?
A: Compression to 200-250 bar and storage in cascade banks before dispensing or injection.

Q4: How is biomethane dispensed or injected?
A: Either filled into vehicles through a CBG dispenser or metered into the natural gas grid.

Q5: What purity is needed?
A: Typically 95-99% CH₄ to meet vehicle fuel or grid-injection specifications.

Q6: Where do slip losses occur?
A: Mainly at the upgrader; membrane and PSA systems show about 0.1-3% methane slip.

Suggested CTA

Send your biogas flow and target purity. We will lay out the biomethane equipment line and size the digester, compressor, and storage.